Delivering Rapid Flare Tip Replacement for a European Polyolefin Facility

< Back to News & Events
September 24, 2025
Ensuring Reliable Performance Through Swift Engineering Support

Greens Combustion recently completed a critical project for a leading European polyolefin facility, replacing a flare tip that had experienced significant thermal degradation across essential components. The original flare tip showed extensive wear, with polymer build up blocking remaining flame stabilisers and smokeless steam injectors, ultimately reducing combustion efficiency and overall performance.

Understanding the urgency of the situation, our team provided a rapid turnaround replacement tip to ensure operations could resume safely and efficiently. The new flare tip was designed and manufactured to meet the client’s combustion efficiency and performance requirements, restoring reliability to a key part of the plant’s system.

This project reflects Greens Combustion’s ongoing commitment to delivering responsive, high quality engineering solutions that keep facilities running at peak performance.

Optimal Combustion Solutions
Reliable industry professionals ready to support your combustion projects.
connect with our specialists